Showing posts with label off. Show all posts
Showing posts with label off. Show all posts

Wednesday, October 22, 2014

Microgrid Deployment Forum 2013 Implementing Island and off grid solutions

Fig1: Transition path from off-grid to full grid connection (Source: http://www.energynautics.com/)
 
Homer Energy is organising the Microgrid Deployment Fórum 2013, a two-day event that will examine business cases, optimal technology mixes and critical steps for successfully deploying microgrid systems in remote, island, and off-grid environments.
 
The event will be held next November 8-9 in Cancun (Mexico) and for sure will be a fantastic opportunity to bring together project and technology developers, system owners and utilities, and other energy professionals from across the industry for in-depth information sharing and networking.
 
As already anticipated at this site (please visit the post "Micro-grids and Sustainable Energy Markets" for further details), the potentality of microgrid market is huge, especially within the off-grid sector, but also as a perfect vehicle for the transition from island systems to full grid interconnection (see Fig1 above)
 
Key drivers for the deployment of microgrids over the next years will be the attractive financial returns from reducing diesel fuel consumption when including Renewable Energy sources in the generation mix, but also the reduction of CO2 emissions and, not less important, achieving energy self-sufficiency.
 
Agenda:
 
Day 1 - Friday, November 8, 2013
Microgrid Business and Technology Issues: Designing and Achieving an Effective Deployment.
 
The first day  will consist of a series of panel sessions that systematically analyze the key steps and requirements for deploying hybrid energy microgrid systems.
 
Day 2 - Saturday, November 9, 2013
HOMER Training and User Group Meeting.
 
 
The second day will consist of an in-depth, hands-on training workshop focused on the use of HOMER Energy software for the design of such systems.
 
Topics of interest will include:
 
  • Microgrid Market Dynamics, Growth & Barriers
  • Recent Advances in Controls, Load Management, Power Engineering, & Storage
  • Conceptual Design and Pre-Feasibility Analysis
  • Non-Technical Factors: Local Stakeholder Issues, Permitting, Community Relations, and Cultural Considerations
  • Financing: Off-Taker Creditworthiness, Capital Structures, & Incentives
  • Microgrid Procurement, Construction, & Commissioning
  • Microgrid Operations, Maintenance, & Management Issues

For further details, please visit:

http://www.microgridconference.com/index.HTML
 
{ Read More }


Saturday, September 27, 2014

Giant tidal device set for tests off Orkney

The BBC has a report on testing of a tidal power design in Scotland - Giant tidal device set for tests off Orkney.
A giant underwater turbine which could form the worlds first tidal power array has been deployed off Orkney. The 100ft-high 1MW (megawatt) Hammerfest Strom HS1000 device was installed by the European Marine Energy Centre (EMEC). It will now undergo tests in preparation for larger-scale production and deployment.

Scottish Power Renewables (SPR) hopes to use the design for a planned array in the Sound of Islay. The device has been developed by Hammerfest Strom, a company partly owned by SPR parent firm Iberdrola. Its substructure was constructed in the Arnish Yard, near Stornoway, in Lewis.

SPR intends to develop a 10MW tidal array in Islay after receiving planning consent from the Scottish government in March this year.

The HS1000 device, which SPR said could power the annual electricity needs of 500 homes, is expected to be fully operational in early 2012. The tests will also help to finalise the timetable for the Islay project, with machines being installed "as early as feasible" between 2013 and 2015.

{ Read More }


IconIconIconFollow Me on Pinterest